The site received a Tier I disposal site classification, issued under the Massachusetts Contingency Plan in September 2006.īetween 20, multiple field investigations were conducted in the upland areas of the site and in adjacent portions of Gloucester InnerHarbor by GZA GeoEnvironmental, Inc. Additional sediment impacts were identified during the collection of sediment borings that were part of a Phase I Initial Site Investigation. In 2003, an unknown quantity of “creosote oil” was released during pile driving for a new dock at 17 Harbor Loop. In the 1960s, the area was part of an urban renewal project, which included re-configuring the Harbor Loop and Rogers Street, and the development of commercial properties in the area. When the plant shut down in 1952, the land was sold, and the buildings demolished. ![]() The Gloucester (Massachusetts) Gas Light Company (GCLC) operated a manufactured gas plant (MGP) facility on the Gloucester waterfront from 1854 to 1952 and produced coal gas and then carbureted water gas for lighting and other purposes in the surrounding community.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |